[1]
Helga, J., Handayati, Y. and Nizar, A. 2023. STRATEGY TO REDUCE COAL HAULING CYCLE TIME TO INCREASE THE PRODUCTIVITY IN PT ADARO INDONESIA. JPIM (Jurnal Penelitian Ilmu Manajemen). 8, 2 (Jun. 2023), 266–282. DOI:https://doi.org/10.30736/jpim.v8i2.1605.